Albabstieg Tunnel, Dornstadt Portal
Project data
Project | Albabstieg Tunnel, Dornstadt Portal |
Location | Dornstadt |
Formwork systems |
|
Special features | After concreting the first tube, the formwork carriage is removed and set up in the second tube of the cut-and-cover structure. In a well-planned logistics masterclass, the relocation took only 15 minutes, thus saving considerable time and money. |
Client | Deutsche Bahn AG represented by DB Projekt Stuttgart-Ulm GmbH |
Main contractor | Arge Tunnel Albabstieg Ed. Züblin AG, Direktion Tunnelbau Max Bögl Stiftung & Co.KG Zentralbereich Tunnelbau |