Kirchberg Bridge
Project data
Project | Flexible formwork for complex formwork tasks |
Completion | 2012 |
Location | Kirchberg near Zwickau |
Purpose | To relieve the daily traffic with a bypass |
Formwork systems |
|
Special features | Faced with a lack of space, the site team opted for NOEratio, an extremely flexible beam formwork system specially designed for engineering structures and system building construction. The components consist of three main elements: steel bracing, NOE H20 timber beams and NOEform formwork facing. |
Client | Landesamt für Straßenbau und Verkehr, Plauen Office |
Main contractor | Arlt Bauunternehmen , GmbH, Frankenhain |