Eye-catching form of bridge near Chemnitz
Project data
Project | Road to the South-East |
Location | Chemnitz/Adelsberg |
Purpose | To carry the enormous increase in traffic volume. |
Formwork systems |
|
Special features | Unconventional design. Two differently shaped abutments, one with straight and one with rounded wing walls, were required because the carriageway had to be widened on one side. |
Client | Landesamt für Straßenbau und Verkehr, Plauen Office, 08523 Plauen |
Main contractor | ARTL Bauunternehmen GmbH, 04654 Frohbrug, OT Frankenhain |
"NOE-Schaltechnik performed all of the formwork planning and design for us and assembled the formwork elements from the various system components in its factory. All we had to do on site was put the elements together. This made our work much easier”
Jan Höpping, Site Project Manager for ARLT