Skip to main content

Gmünder Einhorn Tunnel

   

Project data

ProjectGmünder Einhorn Tunnel

Completion2012

LocationSchwäbisch Gmünd

PurposeThe tunnel is intended to fulfil two goals: to relieve traffic in the town and to allow a forward-looking traffic and transportation concept to be realised in the newly created space.

Formwork systems
  • NOEtop was used for concreting the
    • Foundations
    • Walls for the open retaining wall sections
    • Walls for the cut-and-cover tunnel sections
    • Walls in the ventilation and electrical galleries
  • NOEtec


Special featuresThe system was of particular interest for use on the structures of the Gmünder Einhorn Tunnel mainly because of its extraordinarily large panel sizes: the largest NOEtop panel has dimensions of 5.30 x 2.65 m and therefore the panel area is more than 14 m². These large panels save time and labour costs.

Client

Ed. Züblin AG

Baresel GmbH

G. Hinteregger & Söhne Baugesellschaft m. b. H

ÖSTU-STETTIN Hoch- und Tiefbau GmbH