Bridge construction on the A12 motorway
Project data
Project | Series of new bridges |
Completion | 2008 |
Location | Bridges on the A12 motorway between Storkow and Fürstenwalde |
Purpose | The motorway has been extensively redesigned to be adequate for higher traffic volumes. |
Formwork systems |
|
Special features | All eight new overbridges must be constructed adjacent to the existing bridges. Therefore, there is very little room for formwork and falsework. |
Main contractor | A consortium consisting of Arikon Bau Max Bögl DIW Bau |
"I can only speak highly of the service we received from NOE. The Cottbus branch kept us supplied with helpful data and information, such as detailed formwork drawings and equipment return lists with loading drawings.”
Site Foreman, Mr Mittag